summaryrefslogtreecommitdiff
path: root/COPYING
diff options
context:
space:
mode:
authorSwen Schillig <swen@vnet.ibm.com>2010-10-05 15:12:53 (GMT)
committerJames Bottomley <James.Bottomley@suse.de>2010-10-25 14:42:35 (GMT)
commit0df138476c8306478d6e726f044868b4bccf411c (patch)
tree440dbf3d24868f47addb536089ae1ff7353a31a4 /COPYING
parent229aebb873e29726b91e076161649cf45154b0bf (diff)
downloadlinux-0df138476c8306478d6e726f044868b4bccf411c.tar.xz
[SCSI] zfcp: Fix adapter activation on link down
If an exchange config is executed while the local link is down, the request succeeds but the returned data is incomplete. Proceeding with the adapter activation is leading to an unpredictable behaviour (e.g. kernel panic) caused by invalid values. In such a scenario the recommended ERP is to retry the action and wait for a link up event. If the issue persists the activation has to fail. Signed-off-by: Swen Schillig <swen@vnet.ibm.com> Sigend-off-by: Christof Schmitt <christof.schmitt@de.ibm.com> Signed-off-by: James Bottomley <James.Bottomley@suse.de>
Diffstat (limited to 'COPYING')
0 files changed, 0 insertions, 0 deletions