summaryrefslogtreecommitdiff
path: root/mm/maccess.c
diff options
context:
space:
mode:
authorThomas Gleixner <tglx@linutronix.de>2015-05-05 17:49:49 (GMT)
committerIngo Molnar <mingo@kernel.org>2015-05-08 09:53:55 (GMT)
commit0782e63bc6fe7e2d3408d250df11d388b7799c6b (patch)
treec8b370c5093a2c89bd9ed384971e189e09ec49b7 /mm/maccess.c
parent3e0283a53f7d2f2dae7bc4aa7f3104cb5988018f (diff)
downloadlinux-0782e63bc6fe7e2d3408d250df11d388b7799c6b.tar.xz
sched: Handle priority boosted tasks proper in setscheduler()
Ronny reported that the following scenario is not handled correctly: T1 (prio = 10) lock(rtmutex); T2 (prio = 20) lock(rtmutex) boost T1 T1 (prio = 20) sys_set_scheduler(prio = 30) T1 prio = 30 .... sys_set_scheduler(prio = 10) T1 prio = 30 The last step is wrong as T1 should now be back at prio 20. Commit c365c292d059 ("sched: Consider pi boosting in setscheduler()") only handles the case where a boosted tasks tries to lower its priority. Fix it by taking the new effective priority into account for the decision whether a change of the priority is required. Reported-by: Ronny Meeus <ronny.meeus@gmail.com> Tested-by: Steven Rostedt <rostedt@goodmis.org> Signed-off-by: Thomas Gleixner <tglx@linutronix.de> Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org> Reviewed-by: Steven Rostedt <rostedt@goodmis.org> Cc: <stable@vger.kernel.org> Cc: Borislav Petkov <bp@alien8.de> Cc: H. Peter Anvin <hpa@zytor.com> Cc: Mike Galbraith <umgwanakikbuti@gmail.com> Fixes: c365c292d059 ("sched: Consider pi boosting in setscheduler()") Link: http://lkml.kernel.org/r/alpine.DEB.2.11.1505051806060.4225@nanos Signed-off-by: Ingo Molnar <mingo@kernel.org>
Diffstat (limited to 'mm/maccess.c')
0 files changed, 0 insertions, 0 deletions