summaryrefslogtreecommitdiff
path: root/net/ethernet
diff options
context:
space:
mode:
authorPeter Zijlstra <a.p.zijlstra@chello.nl>2008-01-25 20:08:30 (GMT)
committerIngo Molnar <mingo@elte.hu>2008-01-25 20:08:30 (GMT)
commit6f505b16425a51270058e4a93441fe64de3dd435 (patch)
treebe21e711d93bc4d088b97c4a4f585a5044dbaa7d /net/ethernet
parentfa85ae2418e6843953107cd6a06f645752829bc0 (diff)
downloadlinux-6f505b16425a51270058e4a93441fe64de3dd435.tar.xz
sched: rt group scheduling
Extend group scheduling to also cover the realtime classes. It uses the time limiting introduced by the previous patch to allow multiple realtime groups. The hard time limit is required to keep behaviour deterministic. The algorithms used make the realtime scheduler O(tg), linear scaling wrt the number of task groups. This is the worst case behaviour I can't seem to get out of, the avg. case of the algorithms can be improved, I focused on correctness and worst case. [ akpm@linux-foundation.org: move side-effects out of BUG_ON(). ] Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl> Signed-off-by: Ingo Molnar <mingo@elte.hu>
Diffstat (limited to 'net/ethernet')
0 files changed, 0 insertions, 0 deletions